Development of gangways

18 September, 2015 13:43

Kenz is in charge of the engineering and manufacturing of two telescopic gangways used in the nearby future by the Saudi Arabian Oil Company. These gangways will be two identical electric hydraulic driven: 15-25/1800 OS gangways and will be ready by the end of this year.

< Crane order Shell UK Transport renewed 300t crane for Seafox4 >